    <item>
      <title>ERCOT's 10 MW / 5-second rule: what data center developers should know</title>
      <link>https://gridaxon.io/insights/sso-ercot-10-mw-5-second-rule.html</link>
      <guid isPermaLink="true">https://gridaxon.io/insights/sso-ercot-10-mw-5-second-rule.html</guid>
      <pubDate>Tue, 03 Nov 2026 12:00:00 GMT</pubDate>
      <author>info@gridaxon.io (Satish Natti)</author>
      <category>Large Loads &amp; Data Centers</category>
      <category>SSR &amp; Oscillations</category>
      <description>ERCOT's proposed power variation limit caps how much a large computational load, such as an AI data center, may swing its demand. The draft language allows no more than 10 MW peak-to-peak of active power variation in any rolling 5-second window, measured across 0.1 to 55 Hz. The purpose is to protect the shafts of nearby synchronous generators from fatigue and damage.</description>
    </item>
    <item>
      <title>SSR, SSCI, SSTI, IGE: a field guide to the sub-synchronous alphabet</title>
      <link>https://gridaxon.io/insights/sso-terminology-field-guide.html</link>
      <guid isPermaLink="true">https://gridaxon.io/insights/sso-terminology-field-guide.html</guid>
      <pubDate>Tue, 03 Nov 2026 12:00:00 GMT</pubDate>
      <author>info@gridaxon.io (Satish Natti)</author>
      <category>SSR &amp; Oscillations</category>
      <description>Sub-synchronous oscillation (SSO) is the umbrella term for any oscillatory exchange of energy between the grid and a machine, converter, or other device below the system's rated frequency. Everything else in this field (SSR, IGE, TI, TA, SSTI, SSCI) is a specific mechanism underneath that umbrella. The mechanisms differ in what is interacting, whether a series capacitor is required, and how you screen for them.</description>
    </item>
    <item>
      <title>Sub-synchronous oscillations are back, and the grid around them has changed</title>
      <link>https://gridaxon.io/insights/sso-why-oscillations-are-back.html</link>
      <guid isPermaLink="true">https://gridaxon.io/insights/sso-why-oscillations-are-back.html</guid>
      <pubDate>Tue, 03 Nov 2026 12:00:00 GMT</pubDate>
      <author>info@gridaxon.io (Satish Natti)</author>
      <category>SSR &amp; Oscillations</category>
      <category>Large Loads &amp; Data Centers</category>
      <description>Sub-synchronous oscillation (SSO) is an exchange of energy between the power system and a generator, a converter, or a load at a frequency below 60 Hz. When the system cannot damp that exchange, it grows. Turbine shafts crack, wind turbines trip, and in the worst historical cases the damage happens in less than a second.</description>